
Transition of New High Pressure Unit in Yanshan Petrochemical Company
2019-04-22 18:09
Yanshan Petrochemical PE new high-voltage plant was converted to LD607; the old high-voltage equipment was temporarily stopped on the 10th day, and the second line was repaired on March 19th. It was planned to test again on the 13th day. After stable operation, H188 and the third line were stopped and repaired, waiting for the second line to be stabilized, the test was arranged again; the first line B5703 and the second line 6800CP were produced.
The old LDPE device 3 is EVA/LDPE device. Due to the withdrawal of capital from DuPont Company, Yanshan Petrochemical Company is responsible for the production of the device, and the EVA produced by Sinopec will be sold independently.
Yanshan Petrochemical Co., Ltd. is located in Fangshan District, Beijing, near the Beijing-Guangzhou Line. It has very convenient road and railway transportation conditions. It has 900,000 tons/year ethylene production capacity and 540,000 tons/year polyethylene production capacity.
MORE HZinfo
- Brief Report on the Economic Operation of China's Coatings Industry in 2025
- In 2025, despite the Chinese coatings industry making solid strides on the path of high-quality development, the output of coatings saw a slight decline due to the dual pressures of weak downstream de
-
2026-06-04
- Market Report of the Raw Materials for Coatings and Waterproofing in 2025
- In 2025, China's coatings procurement costs will exhibit a moderate downward trend with structural differentiation, while the paint and raw material market will display a distinct "cost-price" diverge
-
2026-06-04
- Jinbaoli Deeply Cultivates the SpecialCoating & Resin Track
- Whether it is employees, suppliers or customers, only when the three parties are united and sincerely solve problems for each other can a positive cycle be formed to survive the industry cycle.
-
2026-06-04


English
简体中文
Русский
إنجليزي